-
Bug
-
Resolution: Done
-
High
-
Dublin Release
In Dublin (also Casablanca) the Control Loop Design phase is handled by DCAE-DS and not Clamp.
Therefor the DCAE-DS guide needs to be added/referenced in the "Control Loop Design"
The configuration and deployment description of Clamp must be moved to:
"User Guide - Service Deployment"
Postponed to ElAlto due to required additional clarification
- relates to
-
DOC-541 Add section for "Control Loop Instantiation and Configuration" in User Guide
- Closed