-
Story
-
Resolution: Done
-
High
-
None
-
None
-
None
-
None
-
Integration R2 M2, Integration R2 M3
The default installation requires a lot of resources:
29 VM
148 vCPU
336 GB RAM
3 TB Storage
29 floating IP
cf
http://onap.readthedocs.io/en/latest/guides/onap-developer/settingup/fullonap.html#requirements
A more optimized solution should be proposed to help newbies to start with ONAP
Such minimal configuration is intended to deploy all the ONAP components, but to be used for a limited period (a week), a limited number of users and a limited number of VNF to be managed.
The OOM project provides a good target on the minimal footprint that can be used.
1+ VMs
8-128 vCPU (44 peak)
59 + 70(DCAE) = ~128 GB RAM
240 GB Storage
17 floating IPs
https://wiki.onap.org/display/DW/ONAP+on+Kubernetes#ONAPonKubernetes-HardwareRequirements
https://onap.readthedocs.io/en/latest/submodules/oom.git/docs/OOM%20User%20Guide/oom_user_guide.html