Uploaded image for project: 'Policy Framework'
  1. Policy Framework
  2. POLICY-3823

Proof of concept of Controlloop design time with SDC

XMLWordPrintable

      Proof of concept of Controlloop design time with SDC

      As part of this story, SDC components are bought up along with current Clamp.

      The components of SDC should be investigated along with distribution client and Dmaap

      Discussion output shared by SDC team should be considered in finalising the approach

      High level changes & costs should be determined

            sirisha_manchikanti sirisha_manchikanti
            sirisha_manchikanti sirisha_manchikanti
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated:
              Resolved: