Uploaded image for project: 'Release Requirements'
  1. Release Requirements
  2. REQ-1164

Test Control Loop in TOSCA LCM improvement

XMLWordPrintable

      Test the Control Loop in TOSCA LCM improvements.

      For the Control Loop in TOSCA LCM functions CSIT tests are homed in the policy/clamp repo

      The tests are run for every code review (requiring test pass to get a 'verified' score), and they are run automatically for each code merge.

      Test Cases / Test Plan

      The test plan is described in the ONAP Policy Framework Documentation:

      https://docs.onap.org/projects/onap-policy-parent/en/latest/development/devtools/devtools.html
      Lab

      None

      Integration Test Lead(s)

      Sirisha_Manchikanti and rameshiyer27

      Components Involved

      • CLAMP

      Results

      • The tests fail quite regularly due to resource issues in the build servers (requests & operations time out). This can be seen by querying the logs of failed tests. The test can be rechecked by re-triggering the Jenkins job, which usually succeeds with no change required..

            liamfallon liamfallon
            liamfallon liamfallon
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated:
              Resolved: