Uploaded image for project: 'Configuration Persistence Service'
  1. Configuration Persistence Service
  2. CPS-1687

Move functional RI Integration test to integration-test module

XMLWordPrintable

      • Remove Performance Tests & Base
        • cps-ri/src/test/groovy/org/onap/cps/spi/impl/CpsPersistencePerfSpecBase.groovy
        • cps-ri/src/test/groovy/org/onap/cps/spi/performance/CpsDataPersistenceServiceDeletePerfTest.groovy
        • cps-ri/src/test/groovy/org/onap/cps/spi/performance/CpsDataPersistenceServicePerfTest.groovy
        • cps-ri/src/test/groovy/org/onap/cps/spi/performance/CpsModuleReferenceRepositoryPerfTest.groovy
      • Move functional test from
        • cps-ri/src/test/groovy/org/onap/cps/spi/impl/CpsDataPersistenceServiceIntegrationSpec.groovy
        • cps-ri/src/test/groovy/org/onap/cps/spi/impl/CpsModulePersistenceServiceIntegrationSpec.groovy
      • To/integration-test/src/test/groovy/org/onap/cps/integration/functional

      A/C

      • At least same level of code-coverage for CPS-RI Module after old tests have been deleted (cobertura report all modules)
        (the level of code coverage for the RI module will drop because of this move but that is just a limitation due to the location of the new integration tests)

        1. Overall Coverage after.png
          21 kB
          Toine Siebelink
        2. Overall Coverage before.png
          21 kB
          Toine Siebelink

            ToineSiebelink Toine Siebelink
            ToineSiebelink Toine Siebelink
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated:
              Resolved: