-
Task
-
Resolution: Unresolved
-
Medium
-
None
As performance tests have been moved to a new server, the test time limits need to be adjusted to the new server's hardware capability.
Based on the performance plots, the existing limit should be adjusted so that the limit is around the peak values (exact fit not required)
Note the limits in the tests are measured in seconds, while the plots use percentage of limit.
A/C:
- Visually look at the performance plots and observe that the limit is just above the peak values in the measurement.
- Scope: all the performance tests (excluding setup ones)