    • Optimization of CI daily jobs

      CI daily deployments are performed on the different labs involved in integration project:

      Today the daily jobs are different from one lab to another.

      Windriver daily jobs include more robot tests, Orange daily jobs are using the same test suites than in Gating). Ericsson labs is dealing with robot tests.

      The goal of this epic is to work on the improvement of these daily jobs.

      One of the lab could be used to tag "Master" daily that sound really stable (all executed tests PASS).

      It could be useful for people installing the Master for component gating and aiming to start from a reference master one and for end user who would like to install master.

      • Shall we do master tagging based on test results
      • Which lab could do that? Shall we consolidate e.g. 2 labs shall report full success (but need to be sure we tested the "same master"
      • Shall we also harmonize the daily jobs? it means running at least 1 day the same daily suite on all the labs? or distribute the tests across the daily jobs?
      • Automate a consolidated feedback to the community (prototype was showing individual results of the lab)
      • Daily stable? Shall we test stable N-2? distribute the load to save CI?