-
Story
-
Resolution: Done
-
Medium
-
None
Code Structure, Build, and Test 203
CSITs done per component, separate to build
Comprehensive Integration test, part of build The ONAP recommendation is that Integration tests should be a part of the build. Integration Test CSITs done per component, separate to build Comprehensive Integration test, part of build
The ONAP recommendation is that Integration tests should be a part of the build.
- blocks
-
POLICY-3258 Über Story: Integrate TOSCA Control Loop with existing CLAMP
- Closed
1.
|
Investigate current policy framework CSIT's and draft one for clamp | Closed | sirisha_manchikanti | |
2.
|
Implement clamp directory under policy/docker/csit | Closed | sirisha_manchikanti | |
3.
|
Write robot tests for bringing up the controlloop | Closed | sirisha_manchikanti |