Story
-
Resolution: Done
-
High
-
None
-
Policy 23/6 - 7/7
This is the main Jira to capture the work to integrate the TOSCA control loop into the existing CLAMP code base.
The TOSCA Control Loop was a PoC in Honolulu, see:
https://wiki.onap.org/display/DW/TOSCA+Defined+Control+Loop+PoC+in+ONAP+Rel+G+and+in+Rel+H
A description of the work that is needed and the issues that are to be resolved is available here:
https://wiki.onap.org/display/DW/TOSCA+based+Control+Loops+with+the+existing+CLAMP+code+in+the+Policy+Framework
- is blocked by
-
POLICY-3237 Unify the representation of control loops in clamp
- Closed
-
POLICY-3210 REST Endpoint Implementation
- Closed
-
POLICY-3211 Parameter Handling and Parameter Validation
- Closed
-
POLICY-3215 Update CLAMP Module structure to Multi Module Maven approach
- Closed
-
POLICY-3216 Update Docker Build to handle new components
- Closed
-
POLICY-3217 Integration Tests to handle clamp components
- Closed
-
POLICY-3218 Integrate CLAMP GUIs (Instantiation/Monitoring) in the policy-gui repo
- Closed
-
POLICY-3222 Use existing clamp gui to set the parameters during CL instantiation
- Closed
- mentioned in
-
Page Loading...