Uploaded image for project: 'Release Requirements'
  1. Release Requirements
  2. REQ-381

Bulk PM / PM Data Control Extension

XMLWordPrintable

    • Icon: Epic Epic
    • Resolution: Done
    • Icon: High High
    • Guilin Release
    • None
    • None
    • Bulk PM / PM Data Control Extension
    • Requirement (DEPRECATED)
    • 2
    • GO
    • Reduced Scope
    • M
    • Green
    • GO
    • Green
    • GO
    • Green
    • GO
    • Green
    • GO

       Description of Use Case / Requirement:

      PM data collection control provides 5G network operators with a dynamic and more efficient way to configure performance measurement collection on a selected subset of  PNFs/VNFs in the network and complements the existing PM data collection and processing capabilities in ONAP/DCAE. An initial version has been delivered in Rel 6 (5G / Bulk PM / PM Control - REQ-129). Planned enhancements for Rel 7 intend to further increase the capability and the dynamicity of this feature*.*

      Owners (one of these should be the Assignee - use @ notation):

      micbev mark.scott

      Link to HLD/LLD (if any):

       https://wiki.onap.org/pages/viewpage.action?pageId=84644982

      ONAPARC-581

      Dependency Relationships with Other Projects:

       N/A

      Project Impact (Test Only (TO), Code (C)):

       DCAE (C)

      Support Status for each Affected Project (Supported (S); Partially Supported (P); Not Supported (N)):

      DCAE (S)

       Integration Leads (use @ notation): 

      ejamcud

      Company Engagement: 

      Ericsson

            mark.scott mark.scott
            eoskmal eoskmal
            Votes:
            0 Vote for this issue
            Watchers:
            6 Start watching this issue

              Created:
              Updated:
              Resolved: